How Many Yards of Concrete Per Truck? Understanding Concrete Delivery

The amount of concrete a single truck can carry varies significantly, making a simple answer to "how many yards per concrete truck?" impossible. Several factors influence the concrete volume each delivery can hold. Let's break down the key variables and provide a clearer picture.

What Size are Concrete Trucks?

Concrete trucks, also known as cement mixers or ready-mix trucks, come in different sizes. The most common sizes are measured by their capacity in cubic yards:

  • Common Sizes: You'll commonly find trucks with capacities of 7, 8, 9, 10, and even 11 cubic yards. However, larger trucks exist for major construction projects.

  • Regional Variations: The exact sizes available might differ depending on your geographic location and the specific company providing the concrete.

  • Drum Shape and Design: While capacity is the primary measure, subtle differences in drum shape and design can slightly affect the actual usable volume.

Factors Affecting Concrete Truck Capacity:

Several factors can affect the actual amount of concrete delivered per truck beyond the advertised capacity:

  • Type of Concrete: Different concrete mixes, which contain varying amounts of aggregates (sand, gravel, etc.), can have slight variations in density affecting the weight and volume delivered.

  • Truck Maintenance and Condition: Older or poorly maintained trucks might not hold the full advertised capacity.

  • Safety Considerations: To ensure safe and efficient transport, drivers may choose to slightly underfill a truck for maneuverability and stability, especially on challenging routes.

  • Slump and Consistency: The desired consistency or slump of the concrete can influence the volume loaded. A wetter mix might take up slightly more space.

How Much Concrete Do You Need?

Determining the right amount of concrete is crucial for successful projects. Accurate calculations depend on understanding:

  • Project Specifications: Obtain detailed blueprints and plans specifying concrete requirements for footings, foundations, slabs, etc.

  • Volume Calculations: Precisely calculate the cubic yardage needed for your specific application. If unsure, consult a professional engineer or contractor.

  • Waste and Contingency: Always add a small percentage (typically 5-10%) to account for waste and potential errors in your calculations.

Calculating Your Concrete Needs:

Calculating concrete volume requires knowing the length, width, and depth of the area to be poured. The basic formula is: Length x Width x Depth (all in feet) / 27 (cubic feet per cubic yard).

What About Smaller Projects?

For smaller projects, you might not need a full truckload. Concrete companies often offer smaller delivery options, such as "mini-mixers" or "short-load" deliveries which can deliver a fraction of a full truckload.

Contacting Your Concrete Supplier:

The best way to determine the exact amount of concrete a particular truck can carry is by contacting your local ready-mix concrete supplier directly. They can provide precise information based on their specific equipment and the type of concrete you require. They can also help estimate your needs and recommend the appropriate delivery size.

By understanding these factors, you can accurately assess your concrete requirements and ensure you have the right amount delivered for your project, avoiding both shortages and costly overages.